Year:
2022
Location:
Zemun, Batajnički drum bb

Within the Galenika industrial complex, one of the leading pharmaceutical companies in the region, a new production plant for the production of corticosteroids was built. This hall represents a significant step in the modernization of the factory’s capacity, enabling an even more efficient production process in accordance with the highest standards of the pharmaceutical industry.

Our company played a key role in performing rough construction work on this building. We carried out thorough excavations, reinforced concrete foundations, masonry and plastering, as well as waterproofing so that the building would be maximally protected and long-lasting. The project included extensive demolition work, site preparation and adaptation of existing structures to new technical requirements. With attention to precision and quality, we contributed to the creation of a modern and functional hall that meets high industrial standards.